Project Luong worked closely with City leadership and library staff to perform a comprehensive review of the building. The process included scanning historical construction documents, developing updated as-built floor plans, and conducting multiple site visits to evaluate the building’s structural and envelope conditions.
During these inspections, the team performed visual reviews, measured floor elevation changes throughout the building, and conducted selective wall openings to better understand concealed conditions within the building envelope. These investigations provided a clearer understanding of how the structure has responded to decades of environmental exposure and operational use.