The Design
The project serves as the primary transload operations building for moving cargo on and off the freight rail stock running through the campus. With this in mind, design was driven by the need for efficiency and supporting a fast-paced industrial workflow. Supporting this is three pull-thru truck bays and a commercial weigh station for loading and unloading the adjacent rail siding.





